Renovations to the Seminoles’ south end zone are expected to complete in time for the team’s home opener in 2016. The tension structures will be PTFE Chukoh Skytop 800 architectural membrane and cantilever out over the stadium seats from columns located on a new club level deck. The new deck area will add 6,000 premium seats and hosted services. The total fabric plan area covers a 24,930 sq. ft.
Get the full story, click this link to download the press release.