Structure Type: Interior fin facade
Project Scope:
Project Size: 2 acres
Material:
Location: Salt Lake City, UT
Completion Date: August 2020
Owner: Salt Lake City Department of Airports
General Contractor: Gordon Huether Studio
Architect: HOK
Engineer:

Photo credits: Bruce Dickinson

The largest art installation as part of the Salt Lake City International Airport is entitled “The Canyon,” and is being integrated on both the east and west walls of the new central airport terminal. “The Canyon” evokes the Salt Lake City landscape and spans 362 feet, the length of 1.2 football fields, using more than 2 acres of composite fabric, and the equivalent of eight miles of aluminum tubing. The entire work consists of almost 800 individual “fins”.

Get A Free Consultation

Get a free consultation with the most experienced designers and engineers in the industry.

Similar Airport Projects

Greater Rochester International Airport Canopy

Greater Rochester International Airport Canopy

DFW Airport TEXRail Station at Terminal B

DFW Airport TEXRail Station at Terminal B

Austin-Bergstrom International Airport South Terminal

Austin-Bergstrom International Airport South Terminal

Tulsa International Airport Walkway Canopies

Tulsa International Airport Walkway Canopies

Queen Beatrix International Airport

Queen Beatrix International Airport

DFW International Airport Terminal A Parking

DFW International Airport Terminal A Parking

San Diego International Airport Terminal 2 Smart Curb Pavilion

San Diego International Airport Terminal 2 Smart Curb Pavilion

Memphis International Airport

Memphis International Airport

Fresno Yosemite International Airport

Fresno Yosemite International Airport

Abilene Regional Airport

Abilene Regional Airport

Dallas Executive Airport

Dallas Executive Airport