Structure Type: Pedestrian bridge
Project Scope:
Project Size: 2,407 sqft
Material: PTFE
Location: San Diego, CA
Completion Date: 2009
Market Segment: Functional & Commercial Buildings
Owner: Cushman Wakefield
General Contractor: Reno Contracting
Architect: Ferguson Pape Baldwin
Engineer: Coffman Engineers
The mast and cable-stayed PTFE structure provides employees shelter from the elements as they transit from one campus building to another. The efficient tensile design reduces the bridge’s structural load requirements, adding technical aesthetics both day and night.